32 km
Subterranean alignments analyzed
0.1 mm
Surface settlement tolerance modeled
14.2 m
Max TBM diameter analyzed
4D BIM
Excavation kinematic staging
Turnkey Subterranean Engineering
From dense urban subway caverns to deep transit tunnels, our engineering workflows integrate soil-structure interaction with constructability simulation.
Mechanized TBM Drives
Sequential NATM Mining
Shafts & Deep Stations
EPB and slurry shield kinematics, segmental lining ring optimization, tail void grouting simulation, and cutterhead intervention schemes beneath critical utilities.
Heading-and-bench excavation staging, primary shotcrete shell optimization, lattice girder placement, and canopy pipe umbrella pre-support in weak geology.
Diaphragm wall structural design, secant pile perimeter retention, multi-tiered waler strutting, and cavern break-in launch seals for pressurized environments.
De-Risk Your Underground Alignment
Engage our civil structures and geomechanics team during early tender visualization or detailed construction engineering to validate excavation stability.




